4.3.2.2  Groundwater Sampling
Collecting groundwater samples consists of a process involving the following nine steps
(modified from Harter 2003):
1. Preparation
2. Inspecting and accessing the monitoring well
3. Measuring the water level
4. Purging the well
5. Letting the well recover
6. Measuring the water level
7. Collecting the water sample
8. Decontamination
9. Securing the well after sampling
The preparation step involves the following:
• Establishing the list of parameters for analysis.
• Ensuring the purging and sample collection equipment including bailers and
pumps are in working order; these items should be new or properly decontaminated.
• Verifying the correct type and quantity of gloves, splash protection, and other
potentially required health and safety equipment are working properly; these
items should be new or properly decontaminated.