Civil Engineering Reference
In-Depth Information
Fig. 9.3 Research platform Fino1 (
left
and
middle
) close to alpha ventus and relay/transformer
station close to alpha ventus wind turbine AV12 (
right
), taken on 12/13 May 2013
Fig. 9.4 Impressions of dimension of offshore wind turbine and nacelle. Helicopters bring people
to offshore wind farm and let them down on a rope for maintenance work at wind turbine
Fig. 9.5
Left
: Dinghy for diving within
alpha ventus
. Divers checking, lying up, and obtaining
measuring instruments in test district
alpha ventus. Right
: Construction boat for offshore wind
farm mounting close to
alpha ventus
Search WWH ::
Custom Search