Civil Engineering Reference
In-Depth Information
Figure 44:
Montage of prefabricated elements
Finally the first lane of the bridge was realized with success by such complicated tech-
nology and the second was realized using montage from ships just because free access from
the water was available in that case.
Search WWH ::




Custom Search