Civil Engineering Reference
In-Depth Information
Fig. 4.8 Photograph of Electrolytic Tiltmeter
Fig. 4.9 Electrolytic Tiltmeter Details
Installation Procedure: Fig. 4.9 illustrates the installation details of the tiltmeters.
To install each sensor, a 127 mm (5 in) horizontal hole was drilled into the
concrete wall and filled with fast-setting high-strength non-shrink epoxy (Hilti
HY150). A 12.7 mm (0.5 in) diameter stainless steel threaded anchor was then
Search WWH ::




Custom Search