Agriculture Reference
In-Depth Information
Table 5. Water demand and prices in south-eastern basins, by county
Prices of water
( 3 )
Water use
(hm 3 )
Value of water
( 3 )
County
Costs of
Ebro
transfer
Sea-
water de-
salination
Marginal value
of water
(shadow price)
Average
revenue
Average
quasi-rent
Current
Baix Maestrat
29
0.09
0.20
1.80
0.81
0.34
Plana Alta
45
0.09
0.23
1.44
0.67
0.42
Plana Baixa
120
0.09
0.29
1.23
0.58
0.56
Camp de Morvedre
48
0.09
0.30
0.95
0.46
0.34
Camp de Turia
127
0.09
0.31
0.98
0.45
0.40
Horta Nord
50
0.06
0.31
0.82
0.37
0.18
Valencia
25
0.06
0.32
0.58
0.26
0.13
Hoya de Bunyol
13
0.06
0.32
1.40
0.69
0.15
Horta Oest
39
0.06
0.32
0.80
0.38
0.16
Horta Sud
65
0.06
0.33
0.66
0.33
0.19
Ribera Alta
272
0.06
0.35
0.68
0.34
0.31
Ribera Baixa
227
0.06
0.35
0.32
0.18
0.13
Safor
99
0.06
0.46
0.52
0.83
0.40
0.37
Vall d'Albaida
12
0.06
0.46
1.42
0.58
0.14
Costera
30
0.06
0.46
1.01
0.49
0.25
Marina Alta
47
0.09
0.56
0.52
1.04
0.51
0.34
Marina Baixa
17
0.12
0.56
0.52
0.84
0.42
0.20
Alacantí
27
0.12
0.56
0.52
1.54
0.80
0.14
Alt Vinalopó
37
0.12
0.56
0.33
0.17
0.15
Vinalopó Mitja
65
0.15
0.56
1.10
0.67
0.20
Baix Vinalopó
55
0.12
0.57
0.52
0.63
0.30
0.13
Baix Segura
247
0.12
0.57
0.52
0.76
0.37
0.16
Noreste
57
0.12
0.72
0.93
0.53
0.21
Vega del Segura
273
0.12
0.57
0.75
0.42
0.24
Centro
20
0.06
0.57
0.86
0.44
0.18
Noroeste
40
0.06
0.57
0.89
0.43
0.11
Campo de Cartagena
64
0.12
0.61
0.52
3.12
1.40
0.19
Valle del Guadalentín
163
0.12
0.67
0.52
2.29
1.14
0.19
Bajo Almanzora
33
0.15
0.78
0.52
3.61
2.08
0.23
Alto Almanzora
34
0.06
0.92
0.65
0.29
0.08
Campo Tabernas
20
0.06
0.92
0.66
0.30
0.07
Río Nacimiento
11
0.06
1.05
0.72
0.29
0.13
Campo Níjar
47
0.18
1.05
0.52
6.22
3.52
0.29
Alto Andarax
16
0.06
1.05
1.13
0.54
0.15
Campo Dalías
72
0.21
1.05
0.52
9.14
4.59
3.43
Source : Albiac et al. (2006).
Transferring water from the Ebro was the alternative of the National Hydrological
Plan of 2001, which was cancelled when the Spanish government changed hands.
Diverted water would have high costs, with prices varying according to the distance from
the Ebro river (Uche 2003), and ranging between 0.20 and 1.05
3 (Table 5). These
3 price range currently paid by farmers, and at
these prices, the project water will only pay for itself in counties with high-profit crops.
The volume of imported water that counties can absorb at the prices of transferred water
is 761 hm 3 in Júcar, 294 hm 3 in Segura and 132 hm 3 in Sur (Table 3). These quantities
contrast with the planned water transfer targets of 141 hm 3 in Júcar, 362 hm 3 in Segura
and 58 hm 3 in Sur. Thus, there is a significant problem of inconsistency in the Ebro
project for the Segura basin, which can only absorb 294 hm 3 at the water transfer price,
which falls short of the 362 hm 3 assigned in the Ebro project to put an end to groundwater
prices are well above the low 0.06-0.21
 
 
 
Search WWH ::




Custom Search