Environmental Engineering Reference
In-Depth Information
Table 4. Example of criteria clusters and objectives table
Impact categories
Global
Warm-
ing
Air
Qual-
ity
Re-
source
Deple-
tion
Noise Water
Qual-
ity
Local
Cli-
mate
Wild-
life
Land
Dis-
tur-
bance
Group A: General planning
1) Energy supply
Develop on-site renewable and alternative energy supply
●
2) Material sourcing
Limit transportation of materials, increase use of regional materials
and increase material reuse
●
Increase use of recycled material
●
3) Planning
Increase existing facility reuse
●
4) Water use
Increase rainwater collection
●
5) Stormwater
Limit stormwater flows by minimizing impervious areas
●
6) Wetlands
Increase distance between development, wetlands and waterways
●
Limit adverse impacts on wetlands and waterways
●
7) Wildlife
Increase distance between development and endangered species habitat
●
Limit adverse impacts on neighboring wildlife
●
8) Land Disturbances
Increase redevelopment of contaminated sites
●
Preserve greenfields and undeveloped land
●
Ensure land use compatibility with airport development
●
Group B: Airfield
continued on following page