Environmental Engineering Reference
In-Depth Information
References
Arts, J. 1998. EIA
follow-up: on the role of ex-post evaluation in environmental impact assessment.
Groningen: Geo Press.
Au, E. & G.Sanvícens 1996. EIA follow up monitoring and management. EIA
Process
Strengthening.
Canberra: Environmental Protection Agency.
Baseline Environmental Consulting 1989.
Mitigation monitoring and reporting plan for a
woodwaste conversion facility, West Berkeley, California.
Emeryville, California: Baseline
Environmental Consulting.
Beanlands, G.E. & P.Duinker 1983.
An ecological framework for environmental impact
assessment.
Halifax, Nova Scotia: Dalhousie University, Institute for Resource and
Environmental Studies.
Berkes, F. 1988. The intrinsic difficulty of predicting impacts: lessons from the James Bay hydro
project.
Environmental Impact Assessment Review
8,
201-20.
Bisset, R. 1984. Post development audits to investigate the accuracy of environmental impact
predictions.
Zeitschift fúr Umweltpolitik
7
, 463-84.
Bisset, R. & P.Tomlinson 1988. Monitoring and auditing of impacts. In
Environmental impact
assessment,
P.Wathern (ed.). London: Unwin Hyman.
Blandford, C.Associates 1994.
Wind turbine power station construction monitoring study.
Gwynedd: Countryside for Wales.
Bowles, R.T. 1981.
Social impact assessment in small communities.
London: Butterworth.
Buckley, R. 1991. Auditing the precision and accuracy of environmental impact predictions in
Australia.
Environmental Monitoring Assessment
18
, 1-23.
California Resources Agency 1988.
California EIA monitor.
State of California.
CEC (1980). Proposal for a Council Directive Concerning the Assessment of the Environmental
Effects of Certain Public and Private Projects on the Environment, 9 July 1980.
Official Journal
of the
EC, L175, 40-49. Brussels: EC.
CEC (Commission of the European Communities) 1993.
Report from the Commission of the
Implementation of Directive 85/337/EEC on the assessment of the effects of certain public and
private projects on the environment,
vol. 13,
Annexes for all Member States
, COM(93), 28 final.
Brussels: EC, Directorate-General XI.
Chadwick, A. & J.Glasson 1999. Auditing the Socio-Economic Impacts of a Major Construction
Project: The Case of Sizewell B Nuclear Power Station.
Journal of Environmental Planning and
Management
42
(6), 811-36.
Culhane, P.J.1993. Post-EIS environmental auditing: a first Step to making rational environmental
assessment a reality.
Environmental Professional
5
.
Dickman, M. 1991. Failure of environmental impact assessment to predict the impact of mine
tailings on Canada's most northerly hypersaline lake.
Environmental Impact Assessment Review
11
, 171-80.
Dipper, B., C. Jones, C.Wood 1998. Monitoring and post-auditing in environmental impact
assessment: a review.
Journal of Environmental Planning and Management
41
(6), 731-47.
DoEn (Department of Energy) 1986.
Sizewell B Public Inquiry: Report by Sir Frank Layfield.
London: HMSO.
Ecotech Research and Consulting Ltd 1994.
Toyota impact study summary,
unpublished.
EPD (Environmental Protection Department) 1997.
Environmental Impact Assessment Ordinance
and Technical Memorandum on Environmental Impact Assessment.
Hong Kong: EPD Hong
Kong Government.
EPD Hong Kong Special Administrative Region Government 1998.
Guidelines for Development
Projects in Hong Kong-Environmental Monitoring and Audit.
Hong Kong: EPDHK.
ETSU (Energy Technology Support Unit) 1994.
Cemmaes Wind Farm: sociological impact study.
Market Research Associates and Dulas Engineering, ETSU.
Search WWH ::
Custom Search