TABLE 11.4
Typical Examples of Tests Performed, Performance Criteria Employed, and
End Use in Some of the Commercial Projects Described in Al-Tabbaa and
Perera 106
Commercial
Project
Tests
Performed
Performance
Criteria
End Use
Sealosafe plants,
1974
UCS, permeability,
durability,
leachability:
EP-Tox
Disposal
A13: Thames Avenue
to Wennington
highway scheme,
1995
Physical and
leaching tests
CBR (lower bound) -
immediately after
compaction: 3%, after 7
days: 5%
MCV prior to final
compaction: 8.5 lower
bound, 12 upper bound
28 day swell - 5 mm upper
bound
Lightweight fill for use
in embankments
Ardeer site, Scotland,
1995
Strength,
permeability, pH,
ANC
Remediation of
contaminated land for
the prevention of
further groundwater
contamination
West Drayton site,
Middlesex, 1997
Leaching tests
Leaching: Dutch
Intervention Values
Redevelopment of
contaminated ground
for housing
Pumpherston site, nr
Edinburgh, 1999
Density, UCS, in
situ penetrometer
Remediation of a
contaminated site
Long Eaton site,
Nottingham, 2000
Permeability,
bearing capacity
Permeability 10 -9 m/s for
passive barrier section,
permeability of reactive
section comparable with in
situ soil, minimum bearing
capacity: 150 kPa
Remediation and
enabling works on a
contaminated site for a
new retail supermarket
Leytonstone site,
London, 2000
CBR, permeability
Redevelopment of a
brownfield site for the
construction of a
school
Winterton Holme
water treatment
works site, 2000
Strength,
permeability,
leaching tests
Disposal in landfill
 