Civil Engineering Reference
In-Depth Information
Fig. 16.25 Map crack
emerged after galling (adding
ber)
Fig. 16.26 Map crack
emerged after utilizing
troweling machine
Map crack which emerged after galling (adding
fiber) is shown in Fig. 16.25 .
Map crack which emerged after utilizing troweling machine (adding
fiber) is
shown in Fig. 16.26 .
Conclusions on map crack in the experiment were as follows. Map crack usually
emerged one week after ending of curing at other airports, while serious map
dehydration crack emerged massively in this experiment before watering curing on
the second day of concrete molding. It was resulted in by local special climatic
conditions.
In the past, we thought that main causes for map crack are as follows:
effect
of wind speed;
effect of high temperature;
effect of drying;
effect of W/C;
effect of mortar thickness
on concrete surface. Among these reasons, cause of cement itself was regarded as
secondary reason in the past by us. Yet in this experiment, no matter adding
effect of admixture;
effect of cement itself; and
ber
Search WWH ::




Custom Search