Figure 15: Calculated component mass results for the 10-turbine analysis group.
Figure 16 : Normalized specifi c cost results for the 10-turbine analysis group.
4.3.1 Impact to component cost
The next step in the value analysis method is to convert the component mass
requirements into their respective cost. This is more diffi cult than estimating the
loads and mass of components due to the endless change in costs for factors such
as sourcing options, materials, labour, transportation and currency exchange.
Figure 16 shows the levels and relatively fl at trends for component specifi c cost