Civil Engineering Reference
In-Depth Information
Houghton Mifflin. 2000.
The American Heritage Dictionary of the English Language
.
4th ed. Boston: Houghton Mifflin.
Hulett, David. 2009.
Practical Schedule Risk Analysis
. Farnham, Surrey, UK: Gower
Publishing Limited.
——. 2011.
Integrated Cost-Schedule Risk Analysis
. Ashgate Publishing.
Koskela, L., et al. 2002. “The foundations of lean construction,” in
Design and
Construction: Building in Value
, R. Best and G. D. Valence, eds. Oxford:
Butterworth-Heinemann, 211-226.
Larew, R. 1995. “Are any construction overtime 'studies' reliable?”
Cost Engineering
,
40 (9).
Liker, J. K. 2004.
The Toyota Way: 14 Management Principles from the World's Greatest
Manufacturer
. New York, NY: McGraw-Hill.
Locher, W. D., and A. Civitello, Jr. 2008.
Contractor's Guide to Change Orders
.
2nd ed. Anaheim, CA: BNi Building News.
Merriam-Webster. 2008.
Merriam-Webster's Collegiate Dictionary
. 11th ed. Spring-
field, MA: Merriam-Webster.
Morrisey, G. L., T. L. Sechrest, and W. B. Warman. 1997.
Loud and Clear: How to Pre-
pare and Deliver Effective Business and Technical Presentations
.4thed.NewYork,
NY: Perseus topics.
National Institute of Building Sciences. 2007, December.
United States National
Building Information Modeling Standard, Version 1- Part 1: Overview, Principles
and Methodologies
.
Neil, J. M. 1982.
Construction Cost Estimating for Project Control
. Upper Saddle
River, NJ: Prentice Hall.
Oglesby, C., H. Parker, and G. Howell. 1989.
Productivity Improvement in Construc-
tion
. New York, NY: McGraw-Hill.
Peurifoy, R. L., et al. 2010.
Construction Planning, Equipment, and Methods
.7thed.
New York, NY: McGraw-Hill.
Prentice Hall. 2000.
Construction Project Log Book
. Upper Saddle River, NJ: Prentice
Hall.
RSMeans. 2010.
Means Illustrated Construction Dictionary
. 4th ed. Kingston, MA:
RSMeans.
——. 2014. R. S. Means
Building Construction Cost Data
. Kingston, MA: RSMeans.
Regan, S. T. 2013.
AACE International Decision and Risk Management Professional
(DRMP) Certification Study Guide
.: CreateSpace Independent Publishing
Platform.
Thomas, P. I. 2000.
The Contractor's Field Guide
. Upper Saddle River, NJ: Prentice
Hall.
Thompson, P., and J. Perry, eds. 1992.
Engineering Construction Risks: A Guide to
Project Risk Analysis and Risk Management
. London: Telford.
Warburton, R. D. H., and V. Kanabar. 2008. “The Practical Calculation of Schedule
Variance in Terms of Schedule.” Paper presented in the PMI Global Congress
2008—North America, Denver, Colorado, October 2008.