Civil Engineering Reference
In-Depth Information
Rosenau, M. D., Jr. 2005.
Successful Project Management
. 4th ed. Hoboken, NJ:
Wiley.
Sears, S. K., G. A. Sears, and R. H. Clough. 2008.
Construction Project Manage-
ment: A Practical Guide to Field Construction Management
. 5th ed. Hoboken,
NJ: Wiley.
Weinstein, J. T. Jaques. 2010.
Achieving Project Management Success in the Federal
Government
. 1st ed. Tysons Corner, VA: Management Concepts Press.
CONSTRUCTION SCHEDULING LAW
Blinderman Construction Co. v. United States
, 17 Cl. Ct. 860 (1989).
Bockrath, Joseph T., and Fredric L. Plotnick. 2010.
Contracts and the Legal Environ-
ment for Engineers and Architects
. 7th ed. New York, NY: McGraw-Hill.
Bramble, B. B., and M. T. Callahan. 2010.
Construction Delay Claims
.4thed.
New York, NY: Aspen.
Fortec Constructors v. United States
, 8 Cl. Ct. 490 (1985).
Heuer, C. R. 1989.
Means Legal Reference for Design and Construction
. Kingston,
MA: RSMeans.
Peña-Mora, F., C. E. Sosa, and D. S. McCone. 2003.
Introduction to Construction
Dispute Resolution
. Upper Saddle River, NJ: Prentice Hall.
Pickavance, Keith. 2010.
Delay and Disruption in Construction Contracts
.4thed.
London: Sweet & Maxwell.
Stokes, M. 1980.
Labor Law in Contractors' Language
. New York, NY: McGraw-Hill.
Sweet, J. J. 1993.
Avoiding or Minimizing Construction Litigation
. Hoboken, NJ:
Wiley.
Sweet, J., and Schneier, M. M. 2012.
Legal Aspects of Architecture, Engineering and
the Construction Process
. 8th ed. Stamford, CT: Cengage Learning.
Theodore J. Trauner Jr.,, William A. Manginelli, J. Scott Lowe, Mark F. Nagata, and
Brian J. Furniss, et al. (2009).
Construction Delays: Understanding Them Clearly,
Analyzing Them Correctly
. 2nd ed. Burlington, MA: Elsevier.
Wickwire, J. M., T. J. Driscoll, and S. B. Hurlbut. 2009.
Construction Scheduling:
Preparation, Liability, and Claims
. 3rd ed. New York, NY Aspen.
Wilner v. United States, 16 Cl. Ct. 260 (1992).
OTHER
The American Institute of Architects. 2007.
General Conditions of the Contract for
Construction
. Document A201
TM
, Washington, DC: The American Institute of
Architects.
The Associated General Contractors of America. 2005.
The Contractor's Guide to
BIM
. 1st ed. Arlington, VA: AGC Research Foundation.
August, R. 2003.
International Law Dictionary and Directory
. Pullman, WA: Ray
August.
Search WWH ::
Custom Search