Civil Engineering Reference
In-Depth Information
——. 1994b. “Fast Work Earns Big Bonus.” Engineering News-Record (ENR) , April
18, 12.
RSMeans. 2010a. Means Illustrated Construction Dictionary . 4th ed. Kingston, MA:
RSMeans.
——. 2010b. RSMeans Building Construction Cost Data . Note R012909-85.
Kingston, MA: R. S. Means.
SAVE International. What is Value Engineering? http://www.value-eng.org/value_
engineering.php. Accessed 2014.
Senouci, A., and Mubarak, S. 2012. “Profit Optimization for Construction Projects
under Extreme Hot Weather Conditions,” 2012 International Total Cost Man-
agement Conference, November 14-15, 2012, Dubai, UAE.
——. 2012. “Genetic Algorithm-based Multi-Objective Model for Scheduling
of Linear Construction Projects Under Extreme Weather Conditions,” The
First Australasia and South-East Asia Structural Engineering and Construction
Conference, November 28 to December 2, 2012, Perth, Australia.
——. 2013. “Multi-Objective Optimization Model for Scheduling of Construction
Projects under Extreme Weather Conditions.” Journal of Civil Engineering and
Management , accepted for publication.
——. 2103. “Time-Profit Trade-Off of Construction Projects in Extreme Hot
Weather Regions,” Construction CPM Conference, January 28 to February 1,
2013, New Orleans, Louisiana, USA.
Sweet, J., and M. M. Schneier. 2008. Legal Aspects of Architecture, Engineering and
the Construction Process . 8th ed. Eagan, MN: Thomson West.
Tulacz, G. J. 1994. “Penhall: Not Just a Wrecking Crew.” Engineering News-Record
(ENR) , July 11, 28.
U.S. Department of Defense (DoD). Earned Value Management (EVM) Division
(online) http://www.acq.osd.mil/evm/
Warburton, R.D.H., and V. Kanabar. 2008. The Practical Calculation of Schedule
Variance in Terms of Schedule. Paper presented at the PMI Global Congress
2008—North America, Denver, Colorado, October 2008.
Wickwire, J. M., T. J. Driscoll, S. B. Hurlbut, and M. J. Groff. 2009. Construction
Scheduling: Preparation, Liability, and Claims , Hoboken, NJ: Wiley.
——. 2002. Construction Scheduling: Preparation, Liability, and Claims . 2nd ed.
Hoboken, NJ: Wiley.
Wilner v . United States , 16 Cl. Ct. 260 (1992).
Winter, Ron.
2011. DCMA 14-Point
Schedule Assessment
http://www
.ronwinterconsulting.com/DCMA_14-Point_Assessment.pdf
Woolf, Murray B. 2007. Faster Construction Projects with CPM Scheduling .NewYork:
McGraw Hill.
Yamín, R. A. 2002. Cumulative Effect of Productivity Rates in Linear Schedules.
Thesis submitted to the faculty of Purdue University in partial fulfillment of the
requirements for the degree of doctor of philosophy, Purdue University, West
Lafayette, Indiana.
 
Search WWH ::




Custom Search