Civil Engineering Reference
In-Depth Information
Harris, R. B. 1978. Precedence and Arrow Networking Techniques for Construction .
Hoboken, NJ: Wiley.
Hendrickson, C., and T. Au. 1989. Project Management for Construction . Upper Sad-
dle R iver, NJ: Prentice Hall.
Holweg, M.. 2007.
Houghton Mifflin. 2000. The American Heritage Dictionary of the English Language .
4th ed. Boston: Houghton Mifflin.
Huang, R. Y., and D. W. Halpin. 1995. “POLO: Planning and optimization for lin-
ear operations.” Proceedings of the 1995 2nd Congress on Computing in Civil
Engineering, Atlanta, GA, June 5-8, 1995, 1: 1126-1133.
Huang, R. Y., and D. W. Halpin. 2000. “Graphically-based LP Modeling for Linear
Construction Scheduling.” Engineering, Construction and Architectural Manage-
ment 7 (1): 41-51.
Hulett, David. 2009. Practical Schedule Risk Analysis . Gower Publishing Limited.
The Institution of Professional Engineers New Zealand (IPENZ) Engineers New
Zealand. April 2008. “Practice Note 13: Constructability.” http://www.ipenz
.org.nz/ipenz/forms/pdfs/PN13_Constructability.pdf
Kankainen, J., and O. Seppänen. 2003. “A line-of-balance based schedule planning
and control system.” Proceedings of the Eleventh Annual Conference of the Inter-
national Group for Lean Construction, ed. Martínez, J. C., Formoso, C. T., July
22-24, 2003, Virginia Polytechnic Institute and State University, Blacksburg, VA:
12 p.
Kenley, Russell, and O. Seppänen. 2006. “Location-based management system for
construction: Principles and underlying logic.” Proceedings of the 2006 Joint
CIB W55-W65-W86 Symposium on Construction of the 21st Century: Global
and Local Challenges, eds. Pietroforte, R., deAngelis, E., Polverino, F., Rome,
Italy, October 18-20, 2006, Conseil International du Bâtiment, Rotterdam, The
Netherlands, 19 p.
Knowles. 2002. “Adjudication.” Professional Education Seminar.
Koskela, L., G. Howell, G. Ballard, and I. Tommelein. 2002. “The Foundations of
Lean Construction.” In Design and Construction: Building in Value .R.Bestand
G. deValence, eds. Oxford, UK: Butterworth-Heinemann, Elsevier.
Larew, R. E. 1998. “Are Any Construction Overtime 'Studies' Reliable?” Cost Engi-
neering 40 (9).
Liker, J.K. (2004). The Toyota Way: 14 Management Principles from the World's
Greatest Manufacturer, New York: McGraw-Hill, Inc.
Lucko, G. 2008. “Productivity Scheduling Method Compared to Linear and Repet-
itive Project Scheduling Methods.” Journal of Construction Engineering and
Management 134 (9): 711-720
——. 2009. “Productivity Scheduling Method: Linear Schedule Analysis with Singu-
larity Functions.” Journal of Construction Engineering and Management 135 (4):
246-253.
Meredith, J. R., and S. J. Mantel, Jr., 2008. Project Management . 7th ed. Hoboken,
NJ: Wiley.
 
Search WWH ::




Custom Search