DOE
Department of Energy
DOT
Department of Transportation
DRB
dispute review board
DRF
double-restricted float
EA
each
EAC
estimate at completion
EBS
enterprise breakdown structure
EF
early finish time (or date)
EJCDC
Engineers Joint Contract Documents Committee
ENR
Engineering News-Record
magazine,
http://enr.construction.com/Default.asp
EPC
engineer-procure-construct
ERP:
enterprise resource planning
ES
early start time (or date)
ETC
estimate to complete
EV
earned value
EVA
earned value analysis
EVM
earned value management
FCV
forecasted cost variance
FF
FF&E
Furniture, Furnishings and Equipment (architecture); field fabricate &
erect (structural steel); or furniture, fixtures & equipment (real estate)
FICA
Federal Insurance Contributions Act
FIDIC
The International Federation of Consulting Engineers (the acronym
stands for the French version of the na
me), http://www.fidic.
org/
FPS:
frames per second
FRP
formwork, rebar, place (for concrete members)
FS
finish-to-start (relationship)
FSV
forecasted schedule variance
GC
general contractor
GERT
graphical evaluation and review technique
GPM
graphical path method
HSE
health, safety, and the environment
HVAC
heating, ventilation, and air-conditioning
IAI
International Alliance for Interoperability, http://www.iai-na.org/
ID
identity
IEEE
Institute of Electrical and Electronics Engineers, http://www.ieee.org/
Ind. F
independent float
Int. F
interfering float
IPA
immediately preceding ac
tivity
IPD
integrated project delivery
IROR
internal rate of return (on an investment)
IRR
internal rate of return (on an investment)
ISA
immediately succeeding activity