Figure 15.10 Snapshot of TimeLiner column types
of CSV Import or from Microsoft Project and Primavera scheduling applications.
As the schedule is imported, the source of the data, as well as the system location of
the project, are shown in the Data Sources tab. Snapshots of the Data Sources tab of
Navisworks TimeLiner and types of external sources available in the TimeLiner are
given in Figures 15.11 and 15.12, respectively. Using Microsoft (MS) Project or Ora-
cle Primavera P6 is preferred, because updates to the schedule are kept within the 4D
model. If the schedule is manually created, all of the updates must be done by the user.
Figure 15.11 Snapshot of Data Sources tab in Navisworks TimeLiner