Civil Engineering Reference
In-Depth Information
Figure 2.3 Bar chart for placing a simple slab on a grade, with activities “necked” during
nonwork periods
Figure 2.4 Bar chart—loaded with man-hours—for construction of a two-story building
Figure 2.5 Bar chart—loaded with the budget—for construction of a two-story building
Search WWH ::
Custom Search