Civil Engineering Reference
In-Depth Information
processors and spreadsheets, that everyone uses, as well as specialized types that require
knowledge in both the software and the specific technical discipline. Scheduling is no
exception to this rule.
Let us distinguish among three types of knowledge that a scheduler must have:
1.
Knowledge of computer software (and perhaps hardware as well) in project
scheduling specifically but also project management and other related (e.g.,
cost estimating) software
2.
Knowledge of the principles and concepts of project scheduling and control
(as part of project management)
3.
Knowledge of the specific technical field, such as commercial building, indus-
trial, transportation, and so forth
To efficiently operate a scheduling and control program, such as Oracle Primavera
Project Manager (P6) (Oracle Primavera Systems, Inc., Bala Cynwyd, Pennsylvania),
the scheduler must have the first two types of knowledge. The third type is a big plus.
Just because an individual knows computers and can do “computer stuff” does not
mean that he or she can operate a scheduling and project control program. Even if
the individual can operate it, he or she may not understand its language and may have
problems relating to and interpreting the technical information.
Currently, many high-tech innovations such as PCs/laptops, tablets, cell/mobile
phones, digital cameras, and the Internet are available. They have become useful tools
and an essential part of our daily life. Nevertheless, the human factor should never
be underestimated. The combination of good tools and an educated and experienced
operator is the only path to success in project management.
Certification
Several organizations now have a process and examination that lead to certification in
project scheduling. The most prominent ones are:
•
The AACE International's Planning & Scheduling Professional (PSP)
•
The PMI's Scheduling Professional (PMI-SP)
Usually, an applicant for certification in project scheduling has to fulfill certain
conditions:
1.
Achieve minimum education requirements
2.
Achieve minimum experience requirements
3.
Pass the certification examination
4.
Submit application and pay fees
Such certification is important in showing the qualifications of the scheduler,
particularly to a potential employer. A certification from a reputable organization,
Search WWH ::
Custom Search