Civil Engineering Reference
In-Depth Information
Figure 6.3 (a) Bar chart for example 6.2 with a leveled labor assignment (within the
allowable limit); (b) resource, or labor, usage profile for example 6.2, with a labor
assignment within the allowable limit
Figure 6.4 (a) Bar chart for example 6.2 with the labor assignment leveled and more
efficiently distributed; (b) resource, or labor, usage profile for example 6.2 with the
labor assignment efficiently distributed within the allowable limit
Search WWH ::
Custom Search