1.0
Load test result for 30-m
long pile
=
700 kN
0.8
Prior
Updated
0.6
0.51
0.33
0.33
0.33
0.4
0.27
0.22
0.2
0.0
0.9 1.3 1.6
Gradient of unit side shear versus depth (kPa/m)
Figure 13.17
Prior and updated probability distributions for model parameter given one pile load test result
in pile foundation design.
The likelihood function in this case is a function of the sample mean of the individual load
ber of independent tests for an example set of test results; the likelihood function becomes
significantly sharper as the number of independent tests increases.
The test results may not be independent; there may be a systematic variation due to spatial
proximity or measurement error as well as an independent variation. If the total variation
0.947
0.958
(a)
1.0
Load test result for 30-m
long pile
=
700 kN
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
Prior
Updated
E
(
C
)
=
$6.870
E
(
C
/Data)
=
$6,410
0.053
0.042
4500
49,500
Consequence ($ per pile)
Pile length = 30 m
0.993
0.995
(b)
1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
Load test result for 30-m
long pile
=
700 kN
Prior
Updated
E
(
C
)
=
$6.550
E
(
C
/Data)
=
$6,460
0.007
0.005
6125
67,375
Consequence ($ per pile)
Pile length = 35 m
Figure 13.18
Prior and updated probability distributions for consequences given one pile load test result for
alternative pile lengths in pile foundation design.