Civil Engineering Reference
In-Depth Information
7.23
Settlement Calculations Using the Tokimatsu and Seed (1987) Method and the Chart Shown in Fig. 7.7
Multi-
Layer
G max
v
directional
Layer
thickness,
v 0
v ,
[Eq. (7.5)],
eff ( G eff / G max )
eff
% cyc
(Fig. 7.9),
shear
Multiply
Settlement,
in.
(12)
lb/ft 2
kip/ft 2
number
ft
( N 1 ) 60
[Eq. (7.4)]
(Fig. 7.8)
100 eff
percent
2 v
by VSR
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
1.1 10 4
3.0 10 4
3.0 10 2
1
5
238
5
613
0.045
0.09
0.07
0.04
1.9 10 4
5.5 10 4
5.5 10 2
2
5
713
5
1060
0.08
0.16
0.13
0.08
2.6 10 4
8.5 10 4
8.5 10 2
3
10
1425
5
1500
0.13
0.26
0.21
0.25
3.3 10 4
1.0 10 3
1.0 10 1
4
10
2375
5
1940
0.16
0.32
0.26
0.31
3.7 10 4
9.5 10 4
9.5 10 2
5
10
3325
5
2290
0.15
0.30
0.24
0.29
4.0 10 4
9.5 10 4
9.5 10 2
6
10
4275
5
2600
0.15
0.30
0.24
0.29
Total 1.3 in.
Using Fig. 7.7, with a p / g
0.45 and N
15,
v
0.15 percent. Therefore, settlement
(0.15
100)(50 ft)(12 in.)
0.9 in. (2 cm)
 