Civil Engineering Reference
In-Depth Information
FIGURE 13.26
Pile load tests. The reaction frame has been set up, and the hydraulic jack and load cell
are in place.
FIGURE 13.27 Pile load tests. This photograph shows one of the dial gauges that are used to record the
vertical displacement of the top of the pile during testing.
Search WWH ::




Custom Search